Durations are from our 2026 contracts, for typical jobs. With the quote you get the exact deadline for yours.

Full renovations
Full renovations

From demolition to the last socket

Flats and houses. One point of contact, one contract, one deadline. Demolition, new installations, plastering, tiling, flooring, windows and doors, painting, fitting sanitary ware and light fixtures.

  • Two- to three-room flat: 6–8 weeks
  • House of 100–150 m²: 10–14 weeks
  • Structural check included when removing walls
  • 3-year warranty on finishes
Turnkey houses
Turnkey houses

On your design or ours

Masonry or frame structure, roof, full installations, interior and exterior finishes, up to handing over the keys. We work with architects and engineers from Pitești; if you already have a design we build it; if not, we make it together.

  • House of 120–180 m²: 8–11 months
  • Staged estimate, staged payment
  • Acceptance at completion and final acceptance, per law
  • Structure guaranteed for life, hidden defects 10 years
Plumbing and heating
Plumbing and heating

Water, heat, no surprises under the plaster

New installations and full replacements: pipework, boilers, radiators, underfloor heating, water heaters, filters. Boiler installation by ISCIR-authorised staff; periodic technical checks done by us too.

  • Boiler replacement with commissioning: one day
  • Full flat installation: 4–6 days
  • Pressure test on every job, with a report
  • 5-year warranty on workmanship
Electrical
Electrical

ANRE-certified, not “a guy who knows”

New and rewired electrical installations, panels, dedicated circuits, sockets and lighting, earthing, PRAM testing with certificate. The company holds an ANRE type B certificate; our electricians are individually licensed.

  • New flat installation: 3–5 days
  • New panel with RCDs: one day
  • PRAM certificate at handover
  • 5-year warranty
Roofs and façades
Roofs and façades

What keeps out the rain and the cold

Roof frames, metal or ceramic tile roofing, gutters and downpipes, loft conversions, external insulation with mineral wool or polystyrene, decorative render. Waterproofing carries a written 10-year warranty.

  • New roof on a 120 m² house: 2–3 weeks
  • House external insulation: 3–4 weeks
  • Scaffolding and protection included
  • 10-year warranty on waterproofing
Bathrooms and kitchens
Bathrooms and kitchens

The small rooms that make the big difference

We also do them separately from a full renovation: demolition, installations, waterproofing, tiling, sanitary ware, bespoke furniture through our partners. One deadline, one team.

  • Full bathroom: 2–3 weeks
  • Kitchen (without furniture): 2 weeks
  • Waterproofing with a 48-hour water test
  • 3-year warranty finishes, 5 installations